Parr
Calorimeters   
Calorimeter Overview
Stirred Reactor
Stirred Reactor Specification
Optional Fittings
Non-Stirred Pressure
Vessels
Non-Stirred Pressure Vessels Guide
Optional Fittings
Sample Preparation Bombs
Oxygen Combustion Bombs
Acid Digestion Bombs
Microwave Digestion Bombs
Cell Disruption Bombs
Specialty & Custom   
Reactor Systems    
Bomb Maintenance & Maintenance Accessories

Oxygen Bomb Maintenance Kits
500 Firing Kits – One Year Supply 6008 For use w/ 1108(Cl)
6004 For use w/ 1104(B)  6008P For use w/ 1108P(Cl)
6009A For use w/ 1109(A) 6036 For use w/ A895DD (1136, 1138)
6007 For use w/ 1107  6038 For use w/ A1450DD (1136, 1138)

1 Year Service Kit Ordering Guide
These kits are intended to supply the user with the standard parts generally replaced in the calorimeter and oxygen bomb after one year of service. These kits are tailored to the individual calorimeter and bomb choice of the user.
Bomb Model Number
6400 Automatic Isoperibol Calorimeter
6300 Automatic Isoperibol Calorimeter
6200 Isoperibol Calorimeter
6100 Compensated Jacket Calorimeter
1341 Plain Jacket Calorimeter
1108
 
 
6209B
6109B
1349B
1108P
 
 
6209P
6109P
1349P
1108R
 
 
6209R
6109R
1349R
1104
 
 
6209Y
6109Y
1349Y
1109
 
 
6209X
6109X
 
1109A
 
 
6209A
6109A
 
1136 / 1138
 
6309B
 
 
 
1138
6409B
6309C
 
 
 

Oxygen Bomb Repair Service
Oxygen Bombs should be returned on a regular basis to Parr for general over­haul and proof testing. There is a flat rate charge (plus shipping) for the bomb ser­vice. Each service includes:

• Disassembly, cleaning, and inspection of all bomb parts.
• Re-polishing inner surfaces of the bomb cylinder and head.
• Re-assembly with new electrodes, elec­trode insulators and seals, sealing rings and valve seats, if needed to restore the bomb to first class condition.
• Proof testing in accordance with ASTM E144 - 94(2006)e1.

If the bomb head, screw cap, or cylinder must be replaced, they will be billed at current parts prices. If the bomb cylin­der is badly pitted or corroded and must be re-bored there will be an additional charge. Any additional labor required to repair or restore the bomb to usable condition will be billed at current labor cost. Repairs for all other bombs will be charged on a time and materials basis.
HOME | PRODUCTS | ABOUT US | DOWNLOAD | CONTACT US
Copyright 2011 All Rights Reserved Powered by siamzim.com, design by unscar.net
2140/26 ซอย 34 ถนนรามคำแหง แขวงหัวหมาก เขตบางกะปิ กรุงเทพฯ 10240
Tel: 02-377-7386, 02-732-3192 Fax: 02-732-3193
E-mail: sales@siamzim.com